During the renovation of the changing rooms at a large gym, Delfion installed several temporary shower cabins in the cafeteria. This space was temporarily empty and proved suitable for allowing members to shower after exercising.
The shower cabins were connected to the existing water and drainage points and were quickly ready for use. This allowed the gym to continue its services without members having to go to other locations. After completion of the work, the facilities were neatly removed without permanent modifications to the space.
